Countries
Cuba| Cuba | |
| 162,7 MW - 7 windfarms - 74 turbines (*) |


| Zone | Connected capacity (MW) |
Share (%) | |
| Holguin | ![]() | ![]() | |
| Isla de la Juventud | ![]() | ![]() | |
| Ciego de Avila | ![]() | ![]() | |
| Unidentified | 0,0 |

| Manufacturer | Connected capacity (MW) |
Market share (%) | |
| Gamesa | ![]() | ![]() | |
| Goldwind | ![]() | ![]() | |
| Vergnet | ![]() | ![]() | |
| Ecotecnia | ![]() | ![]() | |
| Others | 0,0 | ||
| Unidentified | 0,0 |

| Turbine | Connected capacity (MW) |
Market share (%) | |
| G52/850 | ![]() | ![]() | |
| S50/750 | ![]() | ![]() | |
| GEV MP 275/32 | ![]() | ![]() | |
| 28 | ![]() | ![]() | |
| Others | 0,0 | ||
| Unidentified | 0,0 |

| Power range | Number of connected turbines |
Represented capacity (MW) |
| Less than 1 MW | ![]() |
![]() |
| 1 to 2 MW | ![]() |
![]() |
| 2 to 3 MW | ![]() |
![]() |
| 3 to 4 MW | ![]() |
![]() |
| 4 to 5 MW | ![]() |
![]() |
| 5 to 6 MW | ![]() |
![]() |
| 6 to 7 MW | ![]() |
![]() |
| 7 to 8 MW | ![]() |
![]() |
| More than 8 MW | ![]() |
![]() |

| Period | Number of connected wind farms |
Number of connected turbines |
Represented capacity (MW) |
| Before 1980 | ![]() |
![]() |
![]() |
| 1980 to 1989 | ![]() |
![]() |
![]() |
| 1990 to 1999 | ![]() |
![]() |
![]() |
| 2000 to 2009 | ![]() |
![]() |
![]() |
| 2010 to 2019 | ![]() |
![]() |
![]() |
| Since 2020 | ![]() |
![]() |
![]() |
| Undated | ![]() |
![]() |
![]() |
Databases ![]() Americas (windfarms) World (windfarms) All databases |
||
PDF Summary
|
||
|
Main windfarms in operation Gibara (5,1 MW) Gibara (4,5 MW) Los Canarreos (1,7 MW) Isla Turiguano (0,5 MW) |
||
|
Recent windfarms Gibara (4,5 MW) Los Canarreos (1,7 MW) Gibara (5,1 MW) Isla Turiguano (0,5 MW) Rio Seco (50,0 MW) La Herradura 1 (51,0 MW) La Herradura 2 (50,0 MW) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 22 March 2026 |
||