Wind farms
Echo I (USA)| Echo I (USA) |
|
| Operational (44,55 MW) |

| Country | USA |
| County/Zone | Oregon |
| City | Morrow - Umatilla |
| Other name | Echo |
| Wind farm type | Onshore wind farm |

![]() | 29.7 MW commissioned |
![]() | 14.85 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Vestas V82/1650 (x 27) |

![]() | |

| Part | Echo |
| City | Umatilla |
| Commissioning | ![]() |
| Turbines | 18x Vestas V82/1650 (power 1,650 kW, diameter 82 m) |
| Hub height | ![]() |
| Puissance nominale totale | 29 700 kW |
| Statut | Opérationnel |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 45° 42' 12.6" - Longitude -119° 24' 14.6" |
| Localisation précise | Oui |
| Part | Echo |
| City | Morrow |
| Commissioning | ![]() |
| Turbines | 9x Vestas V82/1650 (power 1,650 kW, diameter 82 m) |
| Hub height | ![]() |
| Puissance nominale totale | 14 850 kW |
| Statut | Opérationnel |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 45° 42' 12.6" - Longitude -119° 24' 14.6" |
| Localisation précise | Oui |
Bases de données ![]() USA (252.1 GW) Amériques (614.9 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Echo II-III (8 km) Orchard Wind (10 km) Wheatridge (21 km) Threemile Canyon (42 km) Nine Canyon I (49 km) Nine Canyon II (49 km) Nine Canyon III (49 km) Shepherds Flat Wind Farm (49 km) Horseshoe Bend (OR) (49 km) South Hurlburt (49 km) | ||
|
Insights Puissance installée USA : 158 826.0 MW (fin 2025) Oregon : 5 074.0 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 18 décembre 2025 |
||