Wind farms
Marmellar (Spain)| Marmellar (Spain) |
|
| Operational (49,5 MW) |

| Country | Spain |
| County/Zone | Burgos (Castilla y Leon) |
| City | Pedrosa del Rio Urbel |
| Wind farm type | Onshore wind farm |

![]() | 49.5 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 1.5sle (x 33) |

![]() | |

| Coordonnées | Latitude 42° 24' 17.3" - Longitude -3° 46' 10.6" |
| Localisation précise | Oui |
Bases de données ![]() Spain (52.7 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Arroyal (1 km) El Paramo (2 km) Sombrio (4 km) Lodoso (7 km) Las Viñas (Fase B) (8 km) Las Viñas (Fase A) (8 km) Fuenteblanca (10 km) Mansilla de Burgos (11 km) Las Atalayas (12 km) Paramo de Vega (13 km) | ||
|
Insights Puissance installée Spain : 33 158.0 MW (fin 2025) Burgos (Castilla y Leon) : 2 389.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 20 janvier 2026 |
||