Wind farms
Cronelea II (Ireland)| Cronelea II (Ireland) |
|
| Operational (4,6 MW) |

| Country | Ireland |
| County/Zone | Wicklow (Leinster) |
| Wind farm type | Onshore wind farm |

![]() | 4.6 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| En fonctionnement | Enercon E70/2300 (x 2) |

![]() | |
![]() | |

| Hauteur nacelle | ![]() |
| Coordonnées | Latitude 52° 46' 39.6" - Longitude -6° 33' 28.3" |
| Localisation précise | Oui |
Bases de données ![]() Ireland (11.3 GW) Europe (660.9 GW) Monde (2452.7 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Cronelea I (0 km) Cronelea Upper (1 km) Cronelea Upper 2 (1 km) Ballycumber (9 km) Knocknalour (11 km) Gibbet Hill (11 km) Ballynancoran (12 km) Ballyduff (14 km) Ballycadden (14 km) Tullow Mushroom Growers Ltd (15 km) | ||
|
Insights Puissance installée Ireland : 5 119.0 MW (fin 2025) Wicklow (Leinster) : 68.5 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 30 juillet 2021 |
||