Wind farms
Till-Moyland (Germany)| Till-Moyland (Germany) |
|
| Operational (3,2 MW) - Dismantled (3,25 MW) |

| Country | Germany |
| County/Zone | Nordrhein-Westfalen |
| City | Bedburg-Hau |
| Wind farm type | Onshore wind farm |

![]() | 0.75 MW commissioned |
![]() | 2.5 MW commissioned |
![]() | 3.2 MW commissioned |
![]() | 0.75 MW decommissioned |
![]() | 2.5 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Senvion 3.2M114 (x 1) |
| Dismantled | Nordex (x 1) |
| Dismantled | Nordex N80/2500 (x 1) |

| No source available |

| City | Bedburg-Hau |
| Commissioning | ![]() |
| Turbine | 1x Nordex |
| Total nominal power | 750 kW |
| Status | Dismantled |
| Coordonnées | Latitude 51° 45' 44.3" - Longitude 6° 7' 47.7" |
| Localisation précise | Oui |
| City | Bedburg-Hau |
| Commissioning | ![]() |
| Turbine | 1x Nordex N80/2500 (power 2,500 kW, diameter 80 m) |
| Hub height | ![]() |
| Total nominal power | 2,500 kW |
| Status | Dismantled |
| Coordonnées | Latitude 51° 46' 26" - Longitude 6° 14' 34.5" |
| Localisation précise | Oui |
| City | Bedburg-Hau |
| Commissioning | ![]() |
| Turbine | 1x Senvion 3.2M114 (power 3,200 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 3,200 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 46' 26" - Longitude 6° 14' 34.5" |
| Localisation précise | Oui |
Bases de données ![]() Germany (104.2 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Kalkar (2 km) Hönnepel (6 km) Neu-Louisendorf (6 km) Lindchen (6 km) Griethausen (7 km) Keppeln (7 km) Uedem (7 km) Goch (7 km) Bedburg-Hau (8 km) Kleve (8 km) | ||
|
Insights Puissance installée Germany : 77 691.0 MW (fin 2025) Nordrhein-Westfalen : 9 671.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 16 août 2022 |
||