Wind farms
Gussenstadt (Germany)| Gussenstadt (Germany) |
|
| Operational (7,5 MW) |

| Country | Germany |
| County/Zone | Baden-Württemberg |
| City | Gerstetten |
| Wind farm type | Onshore wind farm |

![]() | 7.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Repower MD77 (x 5) |

| No source available |

| Coordonnées | Latitude 48° 39' 5.6" - Longitude 9° 56' 13.8" |
| Localisation précise | Oui |
Bases de données ![]() Germany (104.2 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Gerstetten (0 km) Am Hochsträß (0 km) Amstetten (3 km) Schalkstetten (3 km) Böhmenkirch (5 km) Böhmenkirch-Schnittlingen (6 km) Stötten (6 km) Stöttener Berg (6 km) Gnannenweiler (6 km) Forschungstestfeld WINSENT (8 km) | ||
|
Insights Puissance installée Germany : 77 691.0 MW (fin 2025) Baden-Württemberg : 2 108.2 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 20 mai 2022 |
||