Wind farms
Herrenkoog (Germany)| Herrenkoog (Germany) |
|
| Operational (17 MW) |

| Country | Germany |
| County/Zone | Schleswig-Holstein |
| City | Risum-Lindholm |
| Wind farm type | Onshore wind farm |

![]() | 8 MW commissioned |
![]() | 6 MW commissioned |
![]() | 3 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E82/2000 (x 7) |
| Operational | Enercon E82/3000 (x 1) |

| No source available |

| City | Risum-Lindholm |
| Commissioning | ![]() |
| Turbines | 4x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 8,000 kW |
| Status | Operational |
| Coordinates | Latitude 54° 43' 32.3" - Longitude 8° 48' 28.7" |
| Precise localization | Yes |
| City | Risum-Lindholm |
| Commissioning | ![]() |
| Turbines | 3x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Coordinates | Latitude 54° 43' 32.3" - Longitude 8° 48' 28.7" |
| Precise localization | Yes |
| City | Risum-Lindholm |
| Commissioning | ![]() |
| Turbine | 1x Enercon E82/3000 (power 3,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Coordinates | Latitude 54° 43' 16.4" - Longitude 8° 49' 19.6" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Osterdeich (2 km) Bökingharde (2 km) Fahretoft (2 km) Risum-Lindholm (2 km) Dagebüll 2 (5 km) Dagebüll 3 (5 km) Dagebüll (5 km) Einzelanlage (5 km) Galmsbüll (6 km) Bahrenhof (6 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Schleswig-Holstein : 10,437.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 12 September 2022 |
||