Hoher Fläming (Germany)
Operational (50,3 MW)


Localisation  

Country Germany
County/Zone Brandenburg
City Nichel - Treuenbrietzen
Wind farm type Onshore wind farm

Key dates  

 4.5 MW commissioned
 3 MW commissioned
 15 MW commissioned
 11 MW commissioned
 16.8 MW commissioned

Players  

Developers
#ND
Operators
#ND
Owners
#ND
Manufacturers Enercon
GE Vernova
Nordex

Turbines   

OperationalGE Vernova 2.5-120 (x 6)
OperationalGE Vernova 2.75-120 (x 4)
OperationalEnercon E138/4200 (x 4)
OperationalNordex S77 (x 3)
OperationalNordex S70 (x 2)

Sources  

 

Details  

Part #1



CityTreuenbrietzen
Commissioning
Turbines3x Nordex S77 (power 1,500 kW, diameter 77 m)
Hub height
Total nominal power4,500 kW
StatusOperational
OperatorND
OwnerND
CoordinatesLatitude 52° 0' 54.4" - Longitude 12° 45' 59.1"
Precise localizationYes

Part #2



CityTreuenbrietzen
Commissioning
Turbines2x Nordex S70 (power 1,500 kW, diameter 70 m)
Hub height
Total nominal power3,000 kW
StatusOperational
OperatorND
OwnerND
CoordinatesLatitude 52° 0' 54.4" - Longitude 12° 45' 59.1"
Precise localizationYes

Part #3



CityNichel
Commissioning
Turbines4x Enercon E138/4200 (power 4,200 kW, diameter 138.25 m)
Hub height
Total nominal power16,800 kW
StatusOperational
CoordinatesLatitude 52° 6' 4.2" - Longitude 12° 48' 9.5"
Precise localizationNo

Part #4



PartRietz
CityTreuenbrietzen
Commissioning
Turbines4x GE Vernova 2.75-120 (power 2,750 kW, diameter 120 m)
Hub height
Total nominal power11,000 kW
StatusOperational
Developer
CoordinatesLatitude 52° 5' 17.5" - Longitude 12° 47' 28.6"
Precise localizationYes

Part #5



PartRietz
CityTreuenbrietzen
Commissioning
Turbines6x GE Vernova 2.5-120 (power 2,500 kW, diameter 120 m)
Hub height
Total nominal power15,000 kW
StatusOperational
Developer
CoordinatesLatitude 52° 5' 17.5" - Longitude 12° 47' 28.6"
Precise localizationYes

Databases

     

Germany (104.2 GW)
Europe (656.6 GW)
World (2,451.9 GW)

All databases



PDF Summary




Nearby wind farms

Nichel (2 km)
Niederwerbig (2 km)
Treuenbrietzen West (4 km)
Niemegk-Haseloff (4 km)
Niemegk I (4 km)
Niemegk II (5 km)
Feldheim X (6 km)
Feldheim-Nord (8 km)
Feldheim I (9 km)
Schlalach (9 km)


Insights

Production capacity

Germany : 77,691.0 MW (end of 2025)
Brandenburg : 10,012.1 MW (*)


Légende

#ND : no data
(*) : according to The Wind Power database


Update for this sheet

25 October 2023




The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page