Wind farms
Poll (Germany)| Poll (Germany) |
|
| Operational (12,9 MW) |

| Country | Germany |
| County/Zone | Nordrhein-Westfalen |
| City | Nörvenich - Vettweiß |
| Wind farm type | Onshore wind farm |

![]() | 9 MW commissioned |
![]() | 1.5 MW commissioned |
![]() | 0.8 MW commissioned |
![]() | 1.6 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | GE Vernova 1.5sl (x 6) |
| Operational | Enercon E53/800 (x 3) |
| Operational | Fuhrländer FL MD/70 (x 1) |

![]() | |

| City | Vettweiß, Nörvenich |
| Commissioning | ![]() |
| Turbines | 6x GE Vernova 1.5sl (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 9,000 kW |
| Status | Operational |
| Coordinates | Latitude 50° 46' 6.2" - Longitude 6° 40' 35.2" |
| Precise localization | Yes |
| City | Nörvenich |
| Commissioning | ![]() |
| Turbines | 2x Enercon E53/800 (power 800 kW, diameter 52.9 m) |
| Hub height | ![]() |
| Total nominal power | 1,600 kW |
| Status | Operational |
| Coordinates | Latitude 50° 46' 50.8" - Longitude 6° 41' 18.1" |
| Precise localization | Yes |
| City | Nörvenich |
| Commissioning | ![]() |
| Turbine | 1x Enercon E53/800 (power 800 kW, diameter 52.9 m) |
| Hub height | ![]() |
| Total nominal power | 800 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 50° 46' 54.3" - Longitude 6° 41' 16.2" |
| Precise localization | Yes |
| Part | Vettweiß - Nörvenich |
| City | Vettweiß |
| Commissioning | ![]() |
| Turbine | 1x Fuhrländer FL MD/70 (power 1,500 kW, diameter 70 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 50° 46' 7.9" - Longitude 6° 40' 32.4" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Erftstadt (2 km) Vettweiß (6 km) Erfstadt (7 km) Mülheim-Wichterich (10 km) Merzenich (10 km) Gut Steprath (10 km) Weilerswist (10 km) Ginnicker Heide (11 km) Ginnick (11 km) Kerpen (11 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Nordrhein-Westfalen : 9,671.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 5 November 2022 |
||