Wind farms
Burbo Bank (United-Kingdom)| Burbo Bank (United-Kingdom) |
|
| Operational (346 MW) |

| Country | United-Kingdom |
| County/Zone | Offshore |
| Wind farm type | Offshore wind farm |

![]() | 90 MW commissioned |
![]() | 256 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owners |
![]() ![]() ![]() ![]() |
| Manufacturers |
|

| Operational | Vestas V164/8000 (x 32) |
| Operational | Siemens SWT-3.6-107 (x 25) |

![]() | |
![]() | |

| City | #ND |
| Commissioning | ![]() |
| Turbines | 25x Siemens SWT-3.6-107 (power 3,600 kW, diameter 107 m) |
| Hub height | ![]() |
| Total nominal power | 90,000 kW |
| Status | Operational |
| Développeurs | /![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 53° 29' 30.1" - Longitude -3° 12' 0.7" |
| Profondeur | -5 m |
| Localisation précise | Oui |
| Distance à la côte | 7 km |
| Part | Extension |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 32x Vestas V164/8000 (power 8,000 kW, diameter 164 m) |
| Hub height | ![]() |
| Total nominal power | 256,000 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaires | / / /![]() |
| Coordonnées | Latitude 53° 28' 58.7" - Longitude -3° 16' 22.8" |
| Profondeur | -10 m |
| Localisation précise | Non |
| Distance à la côte | 9 km |
Bases de données ![]() United-Kingdom (104.8 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins North Hoyle (14 km) Royal Seaforth Dock (16 km) Port of Liverpool-Mersey Docks (18 km) Hillhouse Waste Water Treatment Works (20 km) Gwynt y Môr (22 km) Kingspan (22 km) Rhyl Flats (27 km) Walkers Factory (34 km) Promised Land Farm (35 km) Awel y Môr (35 km) | ||
|
Insights Puissance installée United-Kingdom : 32 894.0 MW (fin 2025) Offshore : 86 397.2 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 5 juin 2026 |
||