Wind farms
Kambi (Cyprus)| Kambi (Cyprus) |
|
| Operational (9,45 MW) |

| Country | Cyprus |
| County/Zone | Nicosie |
| Wind farm type | Onshore wind farm |

![]() | 2.4 MW commissioned |
![]() | 7.05 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Enercon E92/2350 (x 3) |
| Operational | Enercon E53/800 (x 3) |

![]() | |

| City | #ND |
| Commissioning | ![]() |
| Turbines | 3x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 7,050 kW |
| Status | Operational |
| Développeur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 34° 53' 45.1" - Longitude 33° 7' 34.8" |
| Altitude | 1150 m |
| Localisation précise | Non |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 3x Enercon E53/800 (power 800 kW, diameter 52.9 m) |
| Total nominal power | 2,400 kW |
| Status | Operational |
| Développeur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 34° 53' 30.4" - Longitude 33° 7' 22.6" |
| Localisation précise | Oui |
Bases de données ![]() Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Ayia Anna (34 km) Agia Anna (35 km) Kosi (36 km) Alexigros (36 km) Kellia (45 km) Orites (46 km) | ||
|
Insights Puissance installée Cyprus : 177.0 MW (fin 2025) Nicosie : 9.5 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 18 janvier 2026 |
||