Wind farms
Hove (Lemvig) (Denmark)| Hove (Lemvig) (Denmark) |
|
| Operational (0,9 MW) - Dismantled (1,275 MW) |

| Country | Denmark |
| County/Zone | Lemvig (Midtjylland) |
| City | Hove |
| Wind farm type | Onshore wind farm |

![]() | 0.9 MW commissioned |
![]() | 0.675 MW commissioned |
![]() | 0.45 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.15 MW decommissioned |
![]() | 0.675 MW decommissioned |
![]() | 0.45 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V27/225 (x 4) |
| Dismantled | Vestas V27/225 (x 5) |
| Dismantled | Bonus (x 1) |

![]() | |

| City | Hove |
| Commissioning | ![]() |
| Turbines | 4x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 900 kW |
| Status | Operational |
| Coordinates | Latitude 56° 33' 29.6" - Longitude 8° 13' 24.8" |
| Precise localization | No |
| City | Hove |
| Commissioning | ![]() |
| Turbines | 3x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 675 kW |
| Status | Dismantled (2010/02) |
| Coordinates | Latitude 56° 33' 29.6" - Longitude 8° 13' 24.8" |
| Precise localization | No |
| City | Hove |
| Commissioning | ![]() |
| Turbines | 2x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 450 kW |
| Status | Dismantled (2010/03) |
| Coordinates | Latitude 56° 33' 29.6" - Longitude 8° 13' 24.8" |
| Precise localization | No |
| City | Hove |
| Commissioning | ![]() |
| Turbine | 1x Bonus |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2003/10) |
| Coordinates | Latitude 56° 33' 29.6" - Longitude 8° 13' 24.8" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Torring (Lemvig) (2 km) Vandborg (3 km) Thyboron Havn (5 km) Hovedgard (Lemvig) (6 km) Dybe (6 km) Ramme (7 km) Enlige Garde - Lomborg (7 km) Lomborg (7 km) Rom (7 km) Harboore (7 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Lemvig (Midtjylland) : 285.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 26 April 2019 |
||