Wind farms
Tangy (United-Kingdom)| Tangy (United-Kingdom) |
|
| Operational (18,7 MW) |

| Country | United-Kingdom |
| County/Zone | Argyll and Bute (Scotland) |
| City | Kintyre |
| Wind farm type | Onshore wind farm |

![]() | 12.75 MW commissioned |
![]() | 5.95 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturers |
|

| Operational | Vestas V52/850 (x 15) |
| Operational | Gamesa G52/850 (x 7) |

![]() | |
![]() | |

| City | Kintyre |
| Commissioning | ![]() |
| Turbines | 15x Vestas V52/850 (power 850 kW, diameter 52 m) |
| Hub height | ![]() |
| Total nominal power | 12,750 kW |
| Status | Operational |
| Developers | /![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 55° 30' 0" - Longitude -5° 40' 47.9" |
| Precise localization | Yes |
| Part | Extension |
| City | Kintyre |
| Commissioning | ![]() |
| Turbines | 7x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Hub height | ![]() |
| Total nominal power | 5,950 kW |
| Status | Operational |
| Developers | /![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 55° 29' 37.1" - Longitude -5° 40' 19.2" |
| Precise localization | Yes |
Databases ![]() United-Kingdom (104.8 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Beinn an Tuirc (7 km) Auchadaduie (8 km) Cnoc Donn Arnicle (9 km) Blary Hill (9 km) Deucheran Hill (17 km) Gigha Community (19 km) Cour (24 km) Freasdail (34 km) Allt Dearg Community Wind Farm (50 km) Srondoire Community Windfarm (50 km) | ||
|
Insights Production capacity United-Kingdom : 32,894.0 MW (end of 2025) Argyll and Bute (Scotland) : 437.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 29 May 2026 |
||