Wind farms
Uckermark Klockow (Germany)| Uckermark Klockow (Germany) |
|
| Operational (7,5 MW) - Dismantled (1,5 MW) |

| Country | Germany |
| County/Zone | Brandenburg |
| City | Schönfeld |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 1.5 MW commissioned |
![]() | 1.5 MW commissioned |
![]() | 1.5 MW decommissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Tacke 1.5s (x 5) |
| Dismantled | GE Vernova 1.5sl (x 1) |

![]() | |

| City | Schönfeld |
| Commissioning | ![]() |
| Turbines | 4x Tacke 1.5s (power 1,500 kW, diameter 70.5 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 53° 23' 59.9" - Longitude 14° 0' 35.9" |
| Precise localization | No |
| City | Schönfeld |
| Commissioning | ![]() |
| Turbine | 1x GE Vernova 1.5sl (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Dismantled (2020/02) |
| Coordinates | Latitude 53° 22' 14.7" - Longitude 13° 59' 9.1" |
| Precise localization | No |
| City | Schönfeld |
| Commissioning | ![]() |
| Turbine | 1x Tacke 1.5s (power 1,500 kW, diameter 70.5 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 53° 23' 59.9" - Longitude 14° 0' 35.9" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Uckermark-Prenzlau (1 km) Uckermark (2 km) Klockow (Brandenburg) (2 km) Neuenfeld (3 km) Fahrenwalde (3 km) Tornow (4 km) Uckermark II (4 km) Schönfeld II (4 km) Schönfeld (4 km) Zuesedom (4 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Brandenburg : 10,012.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 7 June 2022 |
||