Wind farms
Serra do Cando (Spain)| Serra do Cando (Spain) |
|
| Operational (29,23 MW) |

| Country | Spain |
| County/Zone | Pontevedra (Galicia) |
| City | A Lama - Cotobade - Forcarei |
| Wind farm type | Onshore wind farm |

![]() | 28.38 MW commissioned |
![]() | 0.85 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G47/660 (x 43) |
| Operational | Gamesa G52/850 (x 1) |

| No source available |

| City | A Lama, Cotobade, Forcarei |
| Commissioning | ![]() |
| Turbines | 43x Gamesa G47/660 (power 660 kW, diameter 47 m) |
| Total nominal power | 28,380 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 30' 0" - Longitude -8° 22' 11.9" |
| Precise localization | No |
| City | A Lama, Cotobade, Forcarei |
| Commissioning | ![]() |
| Turbine | 1x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 850 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 30' 0" - Longitude -8° 22' 11.9" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Monte Seixo (5 km) Monte Seixo Ampliación (5 km) Ameixeiras -Testeiros (13 km) Monte do Ceo (14 km) Masgalan-Campo Do Coco (14 km) Ameixenda-Filgueira (16 km) Tea (17 km) Bidueiros Fase I (19 km) Irixo (21 km) Monte Arca (22 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Pontevedra (Galicia) : 500.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 20 January 2025 |
||