Wind farms
El Redondal Fase 1 (Spain)| El Redondal Fase 1 (Spain) |
|
| Operational (14,45 MW) |

| Country | Spain |
| County/Zone | Leon (Castilla y Leon) |
| City | Castropodame - Turienzo Castañero |
| Wind farm type | Onshore wind farm |

![]() | 14.45 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G52/850 (x 17) |

| No source available |

| Coordonnées | Latitude 42° 32' 36.7" - Longitude -6° 25' 16.2" |
| Localisation précise | Non |
Bases de données ![]() Spain (52.7 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins El Redondal Fase 2 (0 km) San Pedro (ES) (5 km) Argañoso (11 km) Lucillo (12 km) Cerro Becerril (12 km) Era del Pico (13 km) La Mallada (18 km) Valdelón Ampliación (18 km) Valdelón (18 km) El Pedrón (18 km) | ||
|
Insights Puissance installée Spain : 33 158.0 MW (fin 2025) Leon (Castilla y Leon) : 454.1 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 3 janvier 2024 |
||