El Redondal Fase 2 (Spain)| El Redondal Fase 2 (Spain) |
|
| Operational (16,15 MW) |

| Country | Spain |
| County/Zone | Leon (Castilla y Leon) |
| City | Castropodame - Turienzo Castañero |
| Wind farm type | Onshore wind farm |

![]() | 4.25 MW commissioned |
![]() | 11.9 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G58/850 (x 14) |
| Operational | Gamesa G52/850 (x 5) |

| No source available |

| City | Castropodame, Turienzo Castañero |
| Commissioning | ![]() |
| Turbines | 5x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 4,250 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 32' 36.7" - Longitude -6° 25' 16.2" |
| Precise localization | No |
| City | Castropodame, Turienzo Castañero |
| Commissioning | ![]() |
| Turbines | 14x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 11,900 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 32' 36.7" - Longitude -6° 25' 16.2" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (658.2 GW) World (2,455.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms El Redondal Fase 1 (0 km) San Pedro (ES) (5 km) Argañoso (11 km) Lucillo (12 km) Cerro Becerril (12 km) Era del Pico (13 km) La Mallada (18 km) Valdelón Ampliación (18 km) Valdelón (18 km) El Pedrón (18 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Leon (Castilla y Leon) : 454.1 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||