Wind farms
El Redondal Fase 1 (Spain)| El Redondal Fase 1 (Spain) |
|
| Operational (14,45 MW) |

| Country | Spain |
| County/Zone | Leon (Castilla y Leon) |
| City | Castropodame - Turienzo Castañero |
| Wind farm type | Onshore wind farm |

![]() | 14.45 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G52/850 (x 17) |

| No source available |

| Coordinates | Latitude 42° 32' 36.7" - Longitude -6° 25' 16.2" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (658.2 GW) World (2,455.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms El Redondal Fase 2 (0 km) San Pedro (ES) (5 km) Argañoso (11 km) Lucillo (12 km) Cerro Becerril (12 km) Era del Pico (13 km) La Mallada (18 km) Valdelón Ampliación (18 km) Valdelón (18 km) El Pedrón (18 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Leon (Castilla y Leon) : 454.1 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||