Wind farms
El Redondal Fase 1 (Spain)| El Redondal Fase 1 (Spain) |
|
| Operational (14,45 MW) |

| Coordinates | Latitude 42° 32' 36.7" - Longitude -6° 25' 16.2" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() Spain (52.7 GW) Europe (658.2 GW) World (2,455.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms El Redondal Fase 2 (0 km) San Pedro (ES) (5 km) Argañoso (11 km) Lucillo (12 km) Cerro Becerril (12 km) Era del Pico (13 km) La Mallada (18 km) Valdelón Ampliación (18 km) Valdelón (18 km) El Pedrón (18 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Leon (Castilla y Leon) : 454.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||