Wind farms
El Navazo Fase II (Spain)| El Navazo Fase II (Spain) |
|
| Operational (8,85 MW) |

| Country | Spain |
| County/Zone | Burgos (Castilla y Leon) |
| City | Castrojeriz Astudillo - Pedrosa del Principe |
| Wind farm type | Onshore wind farm |

![]() | 8 MW commissioned |
![]() | 0.85 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G80/2000 (x 4) |
| Operational | Gamesa G52/850 (x 1) |

| No source available |

| City | Pedrosa del Principe, Castrojeriz Astudillo |
| Turbines | 4x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Total nominal power | 8,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 15' 35.9" - Longitude -4° 10' 47.9" |
| Precise localization | No |
| City | Pedrosa del Principe, Castrojeriz Astudillo |
| Turbine | 1x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 850 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 15' 35.9" - Longitude -4° 10' 47.9" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms El Carril (1 km) El Carril II (2 km) El Navazo Fase I (2 km) Valbonilla Fase I (3 km) Valbonilla Fase II (3 km) Carrasquillo (3 km) Alto de la Degollada (5 km) Ballestas et Casetona (7 km) El Teruelo (9 km) La Zarzuela (9 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Burgos (Castilla y Leon) : 2,389.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 11 August 2023 |
||