Wind farms
Alto Palancia II (Spain)| Alto Palancia II (Spain) |
|
| Operational (46 MW) |

| Country | Spain |
| County/Zone | Castellon (Comunidad Valenciana) |
| City | Barracas - Viver |
| Wind farm type | Onshore wind farm |

![]() | 16 MW commissioned |
![]() | 30 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G87/2000 (x 15) |
| Operational | Gamesa G80/2000 (x 8) |

| No source available |

| City | Barracas, Viver |
| Commissioning | ![]() |
| Turbines | 8x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Total nominal power | 16,000 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 40° 1' 12" - Longitude -0° 42' 0" |
| Localisation précise | Non |
| City | Barracas, Viver |
| Commissioning | ![]() |
| Turbines | 15x Gamesa G87/2000 (power 2,000 kW, diameter 87 m) |
| Total nominal power | 30,000 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 40° 1' 12" - Longitude -0° 42' 0" |
| Localisation précise | Non |
Bases de données ![]() Spain (52.7 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Alto Palancia I (0 km) Alto Palancia III (1 km) Mazorral y Rajola (3 km) Alto Casillas I (7 km) Alto Casillas II (7 km) El Viudo I (21 km) El Viudo II (22 km) Cerro de la Nevera (26 km) Peñas de Dios I (31 km) Peñas de Dios II (31 km) | ||
|
Insights Puissance installée Spain : 33 158.0 MW (fin 2025) Castellon (Comunidad Valenciana) : 686.7 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 2 janvier 2024 |
||