Wind farms
Sierra del Trigo (Fase I y II) (Spain)| Sierra del Trigo (Fase I y II) (Spain) |
|
| Operational (15,18 MW) |

| Country | Spain |
| County/Zone | Jaén (Andalucía) |
| City | Noalejo |
| Wind farm type | Onshore wind farm |

![]() | 15.18 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| En fonctionnement | Gamesa G47/660 (x 23) |

![]() | |

| Coordonnées | Latitude 37° 30' 47.2" - Longitude -3° 44' 27.7" |
| Localisation précise | Non |
Bases de données ![]() Spain (52.7 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Cueva Dorada (53 km) Los Sillones (53 km) Mamut (55 km) Parque Eólico Experimental Cerros Pelaos (56 km) Valcaire (57 km) Padul (58 km) Loma del Capón (62 km) Lomas de Manteca (63 km) Lomas de Lecrin (63 km) Lecrin (64 km) | ||
|
Insights Puissance installée Spain : 33 158.0 MW (fin 2025) Jaén (Andalucía) : 15.2 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 27 novembre 2024 |
||