Cueva Dorada (Spain)| Cueva Dorada (Spain) |
|
| Operational (19,55 MW) |

| Country | Spain |
| County/Zone | Granada (Andalucía) |
| City | Loja |
| Wind farm type | Onshore wind farm |

![]() | 16.15 MW commissioned |
![]() | 3.4 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G58/850 (x 23) |

| No source available |

| City | Loja |
| Commissioning | ![]() |
| Turbines | 19x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 16,150 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 10' 12" - Longitude -4° 9' 0" |
| Precise localization | No |
| City | Loja |
| Commissioning | ![]() |
| Turbines | 4x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 3,400 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 10' 12" - Longitude -4° 9' 0" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Los Sillones (0 km) Sierra de Arcas (27 km) Padul (46 km) Valcaire (46 km) Mamut (49 km) Loma del Capón (49 km) Parque Eólico Experimental Cerros Pelaos (49 km) Sierra del Trigo (Fase I y II) (53 km) Lomas de Lecrin (56 km) Lomas de Manteca (56 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Granada (Andalucía) : 412.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|