Wind farms
Cueva Dorada (Spain)| Cueva Dorada (Spain) |
|
| Operational (19,55 MW) |
Have you noticed an error or do you have additional information about this wind farm? Feel free to report it.
Every contribution helps improve the quality and reliability of the database. Thank you for your help.
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Los Sillones (0 km) Sierra de Arcas (27 km) Padul (46 km) Valcaire (46 km) Mamut (49 km) Loma del Capón (49 km) Parque Eólico Experimental Cerros Pelaos (49 km) Sierra del Trigo (Fase I y II) (53 km) Lomas de Lecrin (56 km) Lomas de Manteca (56 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Granada (Andalucía) : 412.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 2 January 2024 |
||