Wind farms
Green Ridge Power (USA)| Green Ridge Power (USA) |
|
| Operational (146,6 MW) |

| Country | USA |
| County/Zone | California |
| City | Alameda - Altamont Pass |
| Wind farm type | Onshore wind farm |

![]() | 12.3 MW commissioned |
![]() | 134.3 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Kenetech USW56 (x 1343) |
| Operational | Kenetech (x 41) |

![]() | |

| City | Altamont Pass |
| Commissioning | ![]() |
| Turbines | 41x Kenetech |
| Hub height | ![]() |
| Total nominal power | 12,300 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 42' 39.1" - Longitude -121° 38' 25.7" |
| Precise localization | Yes |
| Part | Altamont Pass |
| City | Alameda |
| Commissioning | ![]() |
| Turbines | 1343x Kenetech USW56 (power 100 kW, diameter 18 m) |
| Hub height | ![]() |
| Total nominal power | 134,300 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 42' 47.2" - Longitude -121° 39' 50.8" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Golden Hills (2 km) Altamont Pass (2 km) Wind Power Partners 90-92 (2 km) Venture Wind I (2 km) Tres Vaqueros II (2 km) Tres Vaqueros I (2 km) Buena Vista (2 km) Diablo Winds (2 km) DifWind IV (2 km) Santa Clara (US) (3 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) California : 7,466.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|