Wind farms
Lepelaarweg (Netherlands)| Lepelaarweg (Netherlands) |
|
| Operational (15,15 MW) |

| Country | Netherlands |
| County/Zone | Flevoland |
| City | Zeewolde |
| Wind farm type | Onshore wind farm |

![]() | 0.9 MW commissioned |
![]() | 3.8 MW commissioned |
![]() | 4.75 MW commissioned |
![]() | 1.7 MW commissioned |
![]() | 1 MW commissioned |
![]() | 3 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Neg Micon NM54/950 (x 9) |
| Operational | Neg Micon NM60/1000 (x 4) |
| Operational | Vestas V52/850 (x 2) |
| Operational | Neg Micon NM52/900 (x 1) |

| No source available |

| City | Zeewolde |
| Commissioning | ![]() |
| Turbines | 3x Neg Micon NM60/1000 (power 1,000 kW, diameter 60 m) |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Coordinates | Latitude 52° 23' 21.6" - Longitude 5° 29' 12.5" |
| Precise localization | Yes |
| City | Zeewolde |
| Commissioning | ![]() |
| Turbines | 2x Vestas V52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 1,700 kW |
| Status | Operational |
| Coordinates | Latitude 52° 23' 21.6" - Longitude 5° 29' 12.5" |
| Precise localization | Yes |
| City | Zeewolde |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM52/900 (power 900 kW, diameter 52.2 m) |
| Total nominal power | 900 kW |
| Status | Operational |
| Coordinates | Latitude 52° 23' 21.6" - Longitude 5° 29' 12.5" |
| Precise localization | Yes |
| City | Zeewolde |
| Commissioning | ![]() |
| Turbines | 4x Neg Micon NM54/950 (power 950 kW, diameter 54 m) |
| Total nominal power | 3,800 kW |
| Status | Operational |
| Coordinates | Latitude 52° 23' 21.6" - Longitude 5° 29' 12.5" |
| Precise localization | Yes |
| City | Zeewolde |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM60/1000 (power 1,000 kW, diameter 60 m) |
| Total nominal power | 1,000 kW |
| Status | Operational |
| Coordinates | Latitude 52° 23' 21.6" - Longitude 5° 29' 12.5" |
| Precise localization | Yes |
| City | Zeewolde |
| Commissioning | ![]() |
| Turbines | 5x Neg Micon NM54/950 (power 950 kW, diameter 54 m) |
| Total nominal power | 4,750 kW |
| Status | Operational |
| Coordinates | Latitude 52° 23' 21.6" - Longitude 5° 29' 12.5" |
| Precise localization | Yes |
Databases ![]() Netherlands (19.6 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lepelaarpad (1 km) Appelvinkweg (1 km) Sterappellaan (2 km) Baardmeesweg (3 km) Knarweg (3 km) Meeuwentocht (3 km) Schollevaarweg (4 km) Ooievaarsweg (4 km) Ossenkampweg (5 km) Bloesemlaan (5 km) | ||
|
Insights Production capacity Netherlands : 11,792.0 MW (end of 2025) Flevoland : 2,226.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 17 January 2026 |
||