Wind farms
Buffalo Gap 2 (USA)| Buffalo Gap 2 (USA) |
|
| Operational (232,5 MW) |

| Country | USA |
| County/Zone | Texas |
| City | Nolan |
| Wind farm type | Onshore wind farm |

![]() | 232.5 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 1.5sle (x 155) |

| No source available |

| Hub height | ![]() |
| Coordinates | Latitude 32° 18' 38" - Longitude -100° 8' 57" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Buffalo Gap 1 (0 km) Buffalo Gap 3 (2 km) Callahan Divide Wind Energy Center (12 km) South Trent Mesa (13 km) Trent Mesa Wind Farm (14 km) Horse Hollow III (17 km) Horse Hollow I (17 km) Turkey Track (18 km) Sweetwater 1 (20 km) Sweetwater 1 & 2 repowering (23 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Texas : 50,699.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 20 December 2025 |
||