Wind farms
Gibara (Cuba)| Gibara (Cuba) |
|
| Operational (9,6 MW) |

| Country | Cuba |
| County/Zone | Holguin |
| Wind farm type | Onshore wind farm |

![]() | 5.1 MW commissioned |
![]() | 4.5 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Gamesa G52/850 (x 6) |
| Operational | Goldwind S50/750 (x 6) |

| No source available |

| Part | Part 1 |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 6x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Hub height | ![]() |
| Total nominal power | 5,100 kW |
| Status | Operational |
| Coordonnées | Latitude 21° 10' 0.6" - Longitude -76° 8' 54.6" |
| Localisation précise | Oui |
| Part | Part 2 |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 6x Goldwind S50/750 (power 750 kW, diameter 50 m) |
| Hub height | ![]() |
| Total nominal power | 4,500 kW |
| Status | Operational |
| Coordonnées | Latitude 21° 8' 54.2" - Longitude -76° 7' 56.2" |
| Localisation précise | Oui |
Bases de données ![]() Amériques (614.9 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins La Herradura 2 (22 km) La Herradura 1 (31 km) Rio Seco (39 km) | ||
|
Insights Puissance installée Cuba : 16.0 MW (fin 2025) Holguin : 59.6 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 6 mars 2023 |
||