Wind farms
Twilling 01-02 (Netherlands)| Twilling 01-02 (Netherlands) |
|
| Operational (1 MW) |

| Country | Netherlands |
| County/Zone | Friesland |
| City | Lemsterland |
| Other name | Lemmer |
| Wind farm type | Onshore wind farm |

![]() | 1 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Lagerwey (x 2) |

| No source available |

| Coordonnées | Latitude 52° 51' 38.8" - Longitude 5° 39' 58.7" |
| Localisation précise | Oui |
Bases de données ![]() Netherlands (19.6 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Tacowind (2 km) Sondel (2 km) Hopweg 65 (6 km) Noordoostpolder Buitendijks (Friesland) (6 km) IJzerpad 16 (6 km) WLF (7 km) Oudemirdum (8 km) Creilerpad (9 km) Polenweg (10 km) Nummer 354 (10 km) | ||
|
Insights Puissance installée Netherlands : 11 792.0 MW (fin 2025) Friesland : 281.4 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 16 janvier 2026 |
||