Wind farms
Schönfeld (Germany)| Schönfeld (Germany) |
|
| Operational (104,95 MW) |

| Country | Germany |
| County/Zone | Brandenburg |
| City | Casekow - Mescherin - Schönfeld - Schwedt - Tantow |
| Wind farm type | Onshore wind farm |

![]() | 4 MW commissioned |
![]() | 24 MW commissioned |
![]() | 6.15 MW commissioned |
![]() | 43.05 MW commissioned |
![]() | 6.9 MW commissioned |
![]() | 17.25 MW commissioned |
![]() | 3.6 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Vestas V112/3075 (x 14) |
| Operational | Enercon E82/2000 (x 12) |
| Operational | Vestas V117/3450 (x 7) |
| Operational | Senvion MM82/2050 (x 3) |
| Operational | Enercon E70/2000 (x 2) |
| Operational | Vestas V136/3450 (x 1) |

![]() | |

| City | Tantow |
| Commissioning | ![]() |
| Turbines | 12x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 24,000 kW |
| Status | Operational |
| Opérateur | ND |
| Propriétaire | ND |
| Coordonnées | Latitude 53° 25' 48.9" - Longitude 14° 2' 27" |
| Localisation précise | Non |
| City | Schönfeld |
| Commissioning | ![]() |
| Turbines | 3x Senvion MM82/2050 (power 2,050 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 6,150 kW |
| Status | Operational |
| Coordonnées | Latitude 53° 8' 31.7" - Longitude 11° 49' 3.3" |
| Localisation précise | Oui |
| City | Schönfeld |
| Commissioning | ![]() |
| Turbines | 2x Enercon E70/2000 (power 2,000 kW, diameter 70 m) |
| Hub height | ![]() |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Coordonnées | Latitude 53° 7' 49.6" - Longitude 11° 49' 5.4" |
| Localisation précise | Non |
| City | Tantow |
| Commissioning | ![]() |
| Turbines | 2x Vestas V117/3450 (power 3,450 kW, diameter 117 m) |
| Hub height | ![]() |
| Total nominal power | 6,900 kW |
| Status | Operational |
| Coordonnées | Latitude 53° 19' 29.1" - Longitude 14° 23' 25.6" |
| Localisation précise | Oui |
| City | Tantow |
| Commissioning | ![]() |
| Turbine | 1x Vestas V136/3450 (power 3,450 kW, diameter 136 m) |
| Hub height | ![]() |
| Total nominal power | 3,600 kW (uprated turbine) |
| Status | Operational |
| Coordonnées | Latitude 53° 16' 11.4" - Longitude 14° 16' 17.5" |
| Localisation précise | Non |
| Part | Eisenbahn Stettin |
| City | Mescherin, Schwedt |
| Commissioning | ![]() |
| Turbines | 5x Vestas V117/3450 (power 3,450 kW, diameter 117 m) |
| Hub height | ![]() |
| Total nominal power | 17,250 kW |
| Status | Operational |
| Opérateur | ND |
| Coordonnées | Latitude 53° 19' 22.3" - Longitude 14° 23' 10.7" |
| Localisation précise | Oui |
| Part | Luckow-Petershagen-Blumberger-Wartin |
| City | Casekow |
| Commissioning | ![]() |
| Turbines | 14x Vestas V112/3075 (power 3,075 kW, diameter 112 m) |
| Hub height | ![]() |
| Total nominal power | 43,050 kW |
| Status | Operational |
| Développeur | ![]() |
| Coordonnées | Latitude 53° 14' 43.6" - Longitude 14° 11' 28.3" |
| Localisation précise | Oui |
Bases de données ![]() Germany (104.2 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Passow (Brandenburg) (1 km) Luckow-Petershagen (2 km) Schmölln (9 km) Randowhöhe (10 km) Krackow II (10 km) Krackow I (10 km) Groß Pinnow (10 km) Hohenfelde (Brandenburg) (10 km) Schmölln II (11 km) Falkenwalde (11 km) | ||
|
Insights Puissance installée Germany : 77 691.0 MW (fin 2025) Brandenburg : 10 012.1 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 28 octobre 2023 |
||