Geilenkirchen (Germany)| Geilenkirchen (Germany) |
|
| Operational (9,9 MW) - Dismantled (0,5 MW) |

| Country | Germany |
| County/Zone | Nordrhein-Westfalen |
| City | Geilenkirchen |
| Wind farm type | Onshore wind farm |

![]() | 0.5 MW commissioned |
![]() | 0.5 MW commissioned |
![]() | 1.8 MW commissioned |
![]() | 1 MW commissioned |
![]() | 4 MW commissioned |
![]() | 0.6 MW commissioned |
![]() | 2 MW commissioned |
![]() | 0.5 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
#ND |

| Operational | Enercon E44/600 (x 4) |
| Operational | Vestas V80/2000 (x 2) |
| Operational | Enercon E58/1000 (x 1) |
| Operational | #ND (x 1) |
| Operational | Enercon E40/500 (x 1) |
| Dismantled | Enercon E40/500 (x 1) |

| No source available |

| City | Geilenkirchen |
| Commissioning | ![]() |
| Turbine | 1x Enercon E40/500 (power 500 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 500 kW |
| Status | Dismantled (2022/01) |
| Coordinates | Latitude 50° 58' 45.3" - Longitude 6° 13' 7.8" |
| Precise localization | No |
| City | Geilenkirchen |
| Commissioning | ![]() |
| Turbine | 1x Enercon E58/1000 (power 1,000 kW, diameter 58 m) |
| Hub height | ![]() |
| Total nominal power | 1,000 kW |
| Status | Operational |
| Coordinates | Latitude 50° 59' 17.8" - Longitude 6° 14' 19.4" |
| Precise localization | No |
| City | Geilenkirchen |
| Commissioning | ![]() |
| Turbines | 2x Vestas V80/2000 (power 2,000 kW, diameter 80 m) |
| Hub height | ![]() |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Coordinates | Latitude 50° 57' 55.7" - Longitude 6° 7' 19.6" |
| Precise localization | No |
| City | Geilenkirchen |
| Commissioning | ![]() |
| Turbines | 3x Enercon E44/600 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 1,800 kW |
| Status | Operational |
| Coordinates | Latitude 50° 57' 55.7" - Longitude 6° 7' 19.6" |
| Precise localization | No |
| City | Geilenkirchen |
| Commissioning | ![]() |
| Turbine | 1x Enercon E44/600 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Operational |
| Coordinates | Latitude 50° 57' 55.7" - Longitude 6° 7' 19.6" |
| Precise localization | No |
| City | Geilenkirchen |
| Commissioning | ![]() |
| Turbine | 1x Enercon E40/500 (power 500 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 500 kW |
| Status | Operational |
| Coordinates | Latitude 50° 59' 40.4" - Longitude 6° 13' 39.9" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Brachelen (0 km) Lindern-Brachelen (1 km) Brachelen I (1 km) Lindern (1 km) Linnich-Gereonsweiler (1 km) Linnich (2 km) Geilenkirchen-Beeck (2 km) Rurich (5 km) Rurich II (5 km) Körrenzig (5 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Nordrhein-Westfalen : 9,671.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 8 September 2022 |
||