Wind farms
Cabril (Portugal)| Cabril (Portugal) |
|
| Operational (20,2 MW) |

| Country | Portugal |
| County/Zone | Viseu (Centro/Norte) |
| City | Castro Daire |
| Wind farm type | Onshore wind farm |

![]() | 16.2 MW commissioned |
![]() | 4 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Enercon E66/1800 (x 9) |
| Operational | Enercon E70/2000 (x 2) |

![]() | |

| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 9x Enercon E66/1800 (power 1,800 kW, diameter 66 m) |
| Total nominal power | 16,200 kW |
| Status | Operational |
| Développeur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 40° 58' 59.4" - Longitude -8° 2' 41.6" |
| Localisation précise | Oui |
| City | Castro Daire |
| Commissioning | ![]() |
| Turbines | 2x Enercon E70/2000 (power 2,000 kW, diameter 70 m) |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Développeur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 40° 58' 39.1" - Longitude -8° 2' 48.5" |
| Localisation précise | Oui |
Bases de données ![]() Portugal (11.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Sobrado (1 km) Lameira (2 km) Arada-Montemuro (2 km) Alto do Côto (4 km) Sao Pedro (4 km) Casais (5 km) Bustelo (PT) (5 km) Fonte da Quelha (6 km) Cinfaes (6 km) Tendais (9 km) | ||
|
Insights Puissance installée Portugal : 5 990.0 MW (fin 2025) Viseu (Centro/Norte) : 1 161.9 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 1 décembre 2023 |
||