Wind farms
Pilsach (Germany)| Pilsach (Germany) |
|
| Operational (13,6 MW) |

| Country | Germany |
| County/Zone | Bayern |
| City | Pilsach |
| Wind farm type | Onshore wind farm |

![]() | 2 MW commissioned |
![]() | 2 MW commissioned |
![]() | 6.4 MW commissioned |
![]() | 3.2 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owners |
![]() ![]() |
| Manufacturers |
|

| Operational | Senvion 3.2M114 (x 3) |
| Operational | Enercon E82/2000 (x 1) |
| Operational | Enercon E70/2000 (x 1) |

![]() | |

| City | Pilsach |
| Commissioning | ![]() |
| Turbine | 1x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 49° 18' 23.1" - Longitude 11° 32' 20.8" |
| Localisation précise | Oui |
| City | Pilsach |
| Commissioning | ![]() |
| Turbine | 1x Enercon E70/2000 (power 2,000 kW, diameter 70 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaires | /![]() |
| Coordonnées | Latitude 49° 18' 37" - Longitude 11° 32' 24.1" |
| Localisation précise | Oui |
| City | Pilsach |
| Commissioning | ![]() |
| Turbine | 1x Senvion 3.2M114 (power 3,200 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 3,200 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 49° 18' 55.6" - Longitude 11° 32' 42.3" |
| Localisation précise | Oui |
| City | Pilsach |
| Commissioning | ![]() |
| Turbines | 2x Senvion 3.2M114 (power 3,200 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 6,400 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 49° 17' 56.5" - Longitude 11° 33' 29.9" |
| Localisation précise | Oui |
Bases de données ![]() Germany (104.2 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Pilsach-Neumarkt (1 km) Kräft (3 km) Deining (6 km) Helena-Heiligenholz (6 km) Wünn (8 km) Harenzhofen (8 km) Deining II (8 km) Zieger (8 km) Winnberg III (9 km) Berg (Bayern) (9 km) | ||
|
Insights Puissance installée Germany : 77 691.0 MW (fin 2025) Bayern : 2 850.8 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 12 mai 2022 |
||