Wind farms
Alto do Talefe (Portugal)| Alto do Talefe (Portugal) |
|
| Operational (13,5 MW) |

| Country | Portugal |
| County/Zone | Braga (Norte) |
| City | Cinfaes |
| Wind farm type | Onshore wind farm |

![]() | 12 MW commissioned |
![]() | 1.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 1.5s (x 9) |

![]() | |

| City | Cinfaes |
| Commissioning | ![]() |
| Turbines | 8x GE Vernova 1.5s (power 1,500 kW, diameter 70.5 m) |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 38' 47" - Longitude -8° 2' 57" |
| Precise localization | Yes |
| City | Cinfaes |
| Commissioning | ![]() |
| Turbine | 1x GE Vernova 1.5s (power 1,500 kW, diameter 70.5 m) |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 38' 47" - Longitude -8° 2' 57" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Serra da Cabreira (0 km) Vilar Chão (1 km) Ruivaes (3 km) Alto da Vaca (4 km) Lomba do Vale (7 km) Lomba Seixa (14 km) Serra do Barroso (15 km) Tâmega (16 km) Serra do Barroso III (17 km) Penouta (PT) (18 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Braga (Norte) : 457.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 6 June 2024 |
||