The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English Français Deutsch Español 

Online access Wind farms Alto Minho (Portugal)


Previous page
Sign up    Log in    Search


Alto Minho (Portugal)
Operational (263 MW)


Localisation  

Country Portugal
County/Zone Viana do Castelo (Norte)
City Melgaço - Monçao - Paredes de Coura - Valença
Wind farm type Onshore wind farm

Key dates  

 26 MW commissioned
 26 MW commissioned
 22 MW commissioned
 30 MW commissioned
 10 MW commissioned
 28 MW commissioned
 32 MW commissioned
 10 MW commissioned
 56 MW commissioned
 23 MW commissioned

Players  

Developers

#ND
Operator
Owners

Manufacturers Enercon
#ND

Turbines   

OperationalEnercon E82/2000 (x 61)
OperationalEnercon E70/2000 (x 59)
Operational#ND (x 10)

Sources  

 
 
 

Details  

Part #1



PartAlto do Corisco
CityMelgaço
Commissioning
Turbines5x Enercon E70/2000 (power 2,000 kW, diameter 70 m)
Total nominal power10,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 42° 1' 5.9" - Longitude -8° 14' 37.9"
Altitude1200 m
Precise localizationYes

Part #2



PartAlto do Corisco
CityMelgaço
Commissioning
Turbines28x Enercon E82/2000 (power 2,000 kW, diameter 82 m)
Total nominal power56,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 42° 1' 5.9" - Longitude -8° 14' 37.9"
Altitude1200 m
Precise localizationYes

Part #3



PartMendoiro/Bustavade
CityMonçao
Commissioning
Turbines13x Enercon E82/2000 (power 2,000 kW, diameter 82 m)
Hub height
Total nominal power26,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 42° 0' 29.6" - Longitude -8° 25' 33.2"
Altitude750 m
Precise localizationYes

Part #4



PartMendoiro/Bustavade
CityMonçao
Commissioning
Turbines13x Enercon E70/2000 (power 2,000 kW, diameter 70 m)
Hub height
Total nominal power26,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 42° 0' 29.6" - Longitude -8° 25' 33.2"
Altitude750 m
Precise localizationYes

Part #5



PartPicos
CityMelgaço
Commissioning
Turbines11x Enercon E70/2000 (power 2,000 kW, diameter 70 m)
Hub height
Total nominal power22,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 42° 4' 52.4" - Longitude -8° 12' 24.1"
Altitude1100 m
Precise localizationYes

Part #6



PartPicos
CityMelgaço
Commissioning
Turbines15x Enercon E82/2000 (power 2,000 kW, diameter 82 m)
Hub height
Total nominal power30,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 42° 4' 52.4" - Longitude -8° 12' 24.1"
Altitude1100 m
Precise localizationYes

Part #7



PartPicoto/São Silvestre
CityValença, Paredes de Coura
Commissioning
Turbines5x Enercon E82/2000 (power 2,000 kW, diameter 82 m)
Hub height
Total nominal power10,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 41° 59' 25.3" - Longitude -8° 34' 6.4"
Altitude700 m
Precise localizationYes

Part #8



PartPicoto/São Silvestre
CityValença, Paredes de Coura
Commissioning
Turbines14x Enercon E70/2000 (power 2,000 kW, diameter 70 m)
Hub height
Total nominal power28,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 41° 58' 49" - Longitude -8° 33' 24.6"
Altitude700 m
Precise localizationYes

Part #9



PartPicoto/São Silvestre
CityMonçao
Commissioning
Turbines10x (manufacturer name not available)
Total nominal power23,000 kW
StatusOperational
OperatorND
OwnersND/
CoordinatesLatitude 42° 0' 55.4" - Longitude -8° 20' 44.1"
Precise localizationNo

Part #10



PartSanto Antonio
CityMonçao
Commissioning
Turbines16x Enercon E70/2000 (power 2,000 kW, diameter 70 m)
Hub height
Total nominal power32,000 kW
StatusOperational
Developers/
Operator
Owners/
CoordinatesLatitude 42° 0' 30.3" - Longitude -8° 17' 58"
Altitude1100 m
Precise localizationYes

Databases

     

Portugal (11.1 GW)
Europe (656.6 GW)
World (2,451.9 GW)

All databases



PDF Summary




Nearby wind farms

Alagoa de Cima (13 km)
As Neves (13 km)
Arbo (15 km)
Montouto 2000 (16 km)
Fonteavia II (23 km)
Fonteavia I (24 km)
Vieiro (27 km)
Deva (29 km)
Sao Paio (36 km)
Bidueiros Fase I (39 km)


Insights

Production capacity

Portugal : 5,990.0 MW (end of 2025)
Viana do Castelo (Norte) : 370.3 MW (*)


Légende

#ND : no data
(*) : according to The Wind Power database


Update for this sheet

6 June 2024




The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page