Wind farms
Thorup (Denmark)| Thorup (Denmark) |
|
| Operational (21,5 MW) - Dismantled (4,5 MW) |

| Country | Denmark |
| County/Zone | Vesthimmerland (Nordjylland) |
| City | Aggersborg - Thorup |
| Wind farm type | Onshore wind farm |

![]() | 4.5 MW commissioned |
![]() | 4.5 MW decommissioned |
![]() | 21.5 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Siemens-Gamesa SWT-DD-130 (x 5) |
| Dismantled | Neg Micon NM48/750 (x 6) |

![]() | |

| City | Thorup |
| Commissioning | ![]() |
| Turbines | 6x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 4,500 kW |
| Status | Dismantled (2019/11) |
| Coordonnées | Latitude 56° 41' 48.3" - Longitude 9° 36' 11.7" |
| Localisation précise | Non |
| City | Aggersborg |
| Commissioning | ![]() |
| Turbines | 5x Siemens-Gamesa SWT-DD-130 (power 4,300 kW, diameter 130 m) |
| Hub height | ![]() |
| Total nominal power | 21,500 kW |
| Status | Operational |
| Coordonnées | Latitude 56° 59' 46" - Longitude 9° 15' 47.2" |
| Localisation précise | Non |
Bases de données ![]() Denmark (10.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Ullerup (0 km) Orbæk (Vesthimmerland) (4 km) Manstrup (4 km) Bejstrup (6 km) Logsted (6 km) Brondum (Vesthimmerland) (7 km) Skarp Salling (7 km) Nørrekær Enge - Næsborg (7 km) Gottrup (Jammerbugt) (8 km) Vandsted (8 km) | ||
|
Insights Puissance installée Denmark : 7 508.0 MW (fin 2025) Vesthimmerland (Nordjylland) : 160.9 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 24 juin 2021 |
||