Wind farms
Koldby (Denmark)| Koldby (Denmark) |
|
| Operational (8,4 MW) - Dismantled (0,4 MW) |

| Country | Denmark |
| County/Zone | Tonder (Syddanmark) |
| City | Koldby |
| Wind farm type | Onshore wind farm |

![]() | 0.4 MW commissioned |
![]() | 7.8 MW commissioned |
![]() | 0.6 MW commissioned |
![]() | 0.4 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
#ND |

| Operational | Micon M1800-600/44 (x 13) |
| Operational | Neg Micon (x 1) |
| Dismantled | #ND (x 1) |

![]() | |

| City | Koldby |
| Commissioning | ![]() |
| Turbines | 13x Micon M1800-600/44 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 7,800 kW |
| Status | Operational |
| Coordinates | Latitude 55° 2' 22.7" - Longitude 8° 38' 16" |
| Precise localization | No |
| City | Koldby |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Operational |
| Coordinates | Latitude 55° 2' 22.7" - Longitude 8° 38' 16" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Rejsby (2 km) Rejsby-Ballum (2 km) Skast (4 km) Husum-Ballum (5 km) Emmerlev (6 km) Randerup (8 km) Harres (9 km) Abterp (9 km) Oster Gammelby (10 km) Gærup (10 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Tonder (Syddanmark) : 185.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 May 2018 |
||