Wind farms
Dinosaur Point Wind Farm (USA)| Dinosaur Point Wind Farm (USA) |
|
| Operational (16,905 MW) |

| Coordinates | Latitude 37° 2' 29.3" - Longitude -121° 11' 4.5" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
Reserved for Premium Access
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Taylor Farms (64 km) Mann Packing (64 km) Salinas Valley Power Station (65 km) Teichert Aggregates (66 km) Correctional Training Facility (66 km) Dole Fresh Vegetables (67 km) City of Soldad (70 km) Difwind VII (79 km) Golden Hills II (79 km) AeroTurbine (79 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) California : 7,466.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 12 January 2025 |
||