[Back to previous page]
Generalities
|
|
Details
- City: Chaves
- Commissioning:

- 1 turbine: Enercon E48/600 (power 600 kW, diameter 48 m)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Thursday, December 7 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 74.6 %
- Expected production: 10,740 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 41° 50' 38.2"
- Longitude: -7° 20' 11.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 18 December 2021
Complete/correct this sheet: