Wind farms
Serra do Leiranco (Portugal)| Serra do Leiranco (Portugal) |
|
| Operational (32,9 MW) |

| Country | Portugal |
| County/Zone | Vila Real (Norte) |
| City | Boticas - Montalegre |
| Wind farm type | Onshore wind farm |

![]() | 28.2 MW commissioned |
![]() | 4.7 MW commissioned |

| Developer | #ND |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Enercon E92/2350 (x 14) |

![]() | |
![]() | |

| City | Boticas, Montalegre |
| Commissioning | ![]() |
| Turbines | 12x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Total nominal power | 28,200 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 41° 44' 29.4" - Longitude -7° 39' 12.7" |
| Precise localization | No |
| City | Boticas, Montalegre |
| Commissioning | ![]() |
| Turbines | 2x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Total nominal power | 4,700 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 41° 44' 29.4" - Longitude -7° 39' 12.7" |
| Precise localization | No |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Leiranco (1 km) Alto do Seixal (12 km) Alturas do Barroso (15 km) Serra do Barroso II (17 km) Serra do Barroso III (18 km) Aguieira (18 km) Terra Fria (19 km) Serra do Barroso (19 km) Cabeço Alto (21 km) Trandeiras (22 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Vila Real (Norte) : 684.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 November 2025 |
||