Part #1:
- Commissioning:

- 10 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 20,000 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 21.5 %
- Expected production: 103,440 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Commissioning:

- 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Total nominal power: 4,700 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 38.3 %
- Expected production: 43,250 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 40° 26' 46"
- Longitude: -7° 21' 31.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 40° 26' 46"
- Longitude: -7° 21' 31.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view