[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Miranda do Corvo
- Commissioning:

- 12 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 24,000 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 38.3 %
- Expected production: 220,400 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Miranda do Corvo
- Commissioning:

- 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 38.9 %
- Expected production: 43,000 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 40° 3' 13.3"
- Longitude: -8° 15' 8.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 40° 3' 13.3"
- Longitude: -8° 15' 8.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 29 December 2020
Complete/correct this sheet: