[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Castanheira de Pêra, Lousa
- Commissioning:

- 23 turbines: Ecotecnia 74 (power 1 670 kW, diameter 74 m)
- Total nominal power: 38,410 kW
- Operational
- Onshore wind farm
- Developer: Enernova
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 30.5 %
- Expected production: 281,220 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Castanheira de Pêra
- Commissioning:

- 2 turbines: Ecotecnia 74 (power 1 670 kW, diameter 74 m)
- Total nominal power: 3,340 kW
- Operational
- Onshore wind farm
- Developer: Enernova
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6 %
- Expected production: 4,820 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 40° 6' 28.6"
- Longitude: -8° 10' 37.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 40° 6' 28.6"
- Longitude: -8° 10' 37.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 December 2022
Complete/correct this sheet: