Generalities
|
|
Details
- City: Darzyno
- Commissioning:

- 6 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: ENEA
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 14 %
- Expected production: 40,250 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 54° 27' 59.6"
- Longitude: 17° 29' 28.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 September 2022