Generalities
|
|
Details
- City: Kopaniewo
- Commissioning: 2015/12
- 30 turbines: Alstom Power 110 (power 3 000 kW, diameter 109.8 m)
- Hub height: 90 m
- Total nominal power: 90,000 kW
- Operational
- Onshore wind farm
- Developers: Alstom Power/CJR Polska
- Operator: Polska Grupa Energetyczna
- Owner: PGE Energia Odnawialna SA
- Source: https://www.pgeeo.pl/en/Our-generation-assets/Wind-Farms/Lotnisko
- Source: http://www.cjr-renewables.com/projects/details.aspx?id=395&title=lotnisko-wind-farm&idioma=en
Production forecast
- From Saturday, February 23 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 30.2 %
- Expected production: 651,530 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 54° 40' 2.1"
- Longitude: 17° 44' 20.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 24 October 2018