[Back to previous page]
Generalities
|
|
Details
- City: Bethenhausen
- Commissioning:

- 1 turbine: e.n.o. energy 92 (power 2 200 kW, diameter 92.8 m)
- Hub height:

- Total nominal power: 2,200 kW
- Operational
- Onshore wind farm
- Operator: e.n.o. energy
Production forecast
- From Saturday, September 30 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 15.6 %
- Expected production: 8,220 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 50° 57' 44.2"
- Longitude: 12° 13' 51.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 14 June 2022
Complete/correct this sheet: