[Back to previous page]
Generalities
|
|
Details
- City: Jülich
- Commissioning: 2003
- 5 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height: 85 m
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developer: BMR
- Operator: BMR
- Owner: BMR
- Source: http://www.bmr-energy.com/PDF/Referenzliste-Wind.pdf
Production forecast
- From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 86.1 %
- Expected production: 154,930 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 50° 58' 4.8"
- Longitude: 6° 25' 20.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 4 February 2019
Complete/correct this sheet: