Part #1:
- City: Bergholz
- Commissioning:

- 7 turbines: Tacke TW-600 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
- Owner:

- Source:

- Source:

- Source:

- Source:

Part #2:
Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 16.3 %
- Expected production: 21,140 kWh
- Values from Weathernews Windcaster solution
Part #3:
Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 11.2 %
- Expected production: 3,240 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Rossow
- Commissioning:

- 4 turbines: Enercon E48/800 (power 800 kW, diameter 48 m)
- Hub height:

- Total nominal power: 3,200 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 14.2 %
- Expected production: 10,880 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 27' 33.3"
- Longitude: 14° 9' 19.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 27' 33.3"
- Longitude: 14° 9' 19.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 53° 27' 33.3"
- Longitude: 14° 9' 19.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 27' 33.7"
- Longitude: 14° 9' 41.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 24 June 2022