- 6 turbines: Enercon E66/1500 (power 1 500 kW, diameter 66 m)
- Hub height:

- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developer: Windwärts
- Operator: Windwärts
- Source:

Part #2:
- City: Sarstedt, Laatzen
- Commissioning:

- 2 turbines: Enercon E66/1500 (power 1 500 kW, diameter 66 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 69.4 %
- Expected production: 49,970 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 16' 7.6"
- Longitude: 9° 54' 35.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 16' 7.6"
- Longitude: 9° 54' 35.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 March 2019
Complete/correct this sheet: