Details
Part #1:
- City: Beckum
- Commissioning:

- 1 turbine: Tacke TW-600 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #2:
- City: Beckum
- Commissioning:

- 4 turbines: Bonus B54/1000 (power 1 000 kW, diameter 54.1 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Owner:

Part #3:
- City: Beckum
- Commissioning:

- 1 turbine: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
- Hub height:

- Total nominal power: 1,300 kW
- Operational
- Onshore wind farm
Part #4:
- City: Beckum
- Commissioning:

- 3 turbines: Repower 57/1000 (power 1 000 kW, diameter 57 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #5:
- City: Beckum
- Commissioning:

- 2 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #6:
- Part: Balve
- City: Balve
- Commissioning:

- 2 turbines: Fuhrländer FL 1500/77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Juwi
Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4 %
- Expected production: 2,910 kWh
- Values from Weathernews Windcaster solution
Part #7:
- Part: Balve
- City: Balve
- Commissioning:

- 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: SeeBA EnergyFarming
- Source:

Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.7 %
- Expected production: 2,270 kWh
- Values from Weathernews Windcaster solution
Part #8:
- Part: Beckum
- City: Beckum
- 2 turbines: Tacke TW-600 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Developer: Energiekontor
- Operator: Energiekontor
- Owner:

- Source:

Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 9.7 %
- Expected production: 2,810 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 46' 45.2"
- Longitude: 8° 6' 7.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 47' 11.4"
- Longitude: 8° 5' 51.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 47' 38.7"
- Longitude: 8° 5' 59.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 46' 17.1"
- Longitude: 8° 6' 0.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 51° 46' 28.6"
- Longitude: 8° 6' 14.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Part: Balve
- Latitude: 51° 22' 8.8"
- Longitude: 7° 53' 49.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #7:
- Part: Balve
- Latitude: 51° 21' 58.6"
- Longitude: 7° 53' 50.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #8:
- Part: Beckum
- Latitude: 51° 47' 14.9"
- Longitude: 8° 5' 56"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 July 2021
Complete/correct this sheet: